CRYSTAL RAIN Taoyuan Business center Renew

The width of the glass unit gradually narrows from top to bottom, which effectively blocks the exposed air-conditioning units in the apartment part. At the same time, the appearance of the upper and lower functions is continuous and unified. These jumping "raindrops" make the entire façade unique.
The function of the main building before the renovation was a large commercial building. The vertical traffic was basically arranged on the periphery of the building. It was vacant for many years. The owner later decided to convert the project into a complex building of offices and apartments.

First, we divided the 180-meter-long curved building into three 60X35-meter independent units, each with an independent entrance lobby. The existing vertical traffic core close to the outer wall is cancelled, and the core tube is centrally arranged in the middle of each unit to maximize the daylighting surface of the outer wall to the office space, so as to obtain an office space with a reasonable depth.

According to the requirements of Party A, the apartment above the 5th floor is an apartment with a small depth, with an outdoor balcony, and the office space below is basically a glass curtain wall. Dotted on the outer wall, the width of the glass unit gradually narrows from top to bottom, effectively blocking the air-conditioning unit in the apartment, and at the same time, the appearance of the upper and lower functions is continuous and unified. These jumping "raindrops" give the entire facade a unique personality.

The east side of the building is close to the residential community. The two grayscale exterior wall paints cooperate with the inward-recessed point windows to avoid light pollution of the curtain wall, shading and saving energy while controlling the cost.